Time to verify new data

Status: Closed · Asked by viniciussricci on · 0 views

viniciussricci — Question ·

I need the time for verifying the new date of my workflows to be the minimum possible, I tried to make the manual change but from what I understood it has to be done by an admin, it would have already been configured so that all the workflows created were already configured with the minimum time possible so that I don't have to open a new topic for each flow I create?

Thanks in advance

Pabblymember11 — Reply ·

Hey @viniciussricci

Could you please provide a brief explanation of your concern so that we can check into the possibility and help you appropriately?

viniciussricci — Reply ·

I used another trigger where the capture was in real time and my problem is already solved, thanks for the feedback.

Back to all forum threads · Log in to reply