Enrique Pérez
Member
I have the following flow: (facebook leads -> google sheets), I have an error in the time when the lead was made due to the time zone it always comes out +00:00:00:00.
but I have configured -5:00:00:00 in pabbly connect and in the respective FB accounts.
How can I fix it?
but I have configured -5:00:00:00 in pabbly connect and in the respective FB accounts.
How can I fix it?