• Instructions to Ask a Question

    Click on the "Ask a Question" button and select the application for which you would like to ask questions.

    We have 5 different products namely - Pabbly Connect, Pabbly Subscription Billing, Pabbly Email Marketing, Pabbly Form Builder, Pabbly Email Verification.

    The turnaround time is 24 hrs (Business Hours - 10.00 AM to 6.00 PM IST, Except Saturday and Sunday). So your kind patience will be highly appreciated!

    🚀🚀Exclusive Discount Offer

    Just in case you're looking for any ongoing offers on Pabbly, you can check the one-time offers listed below. You just need to pay once and use the application forever -
     

    🔥 Pabbly Connect One Time Plan for $249 (🏆Lifetime Access) -  View offer 

    🔥 Pabbly Subscription Billing One Time Plan for $249 (🏆Lifetime Access) - View offer

Search results

  1. Pabblynaut

    Can you add new rows to top of Google sheet instead of bottom?

    Can you add new rows to top of Google sheet instead of bottom?
  2. Pabblynaut

    OpenAI - Response not received in 25 seconds.

    It is not true that if a request works in the Playground, it will automatically work in Pabbly. Maybe the reason is that the load on OpenAI servers varies throughout the day, so sometimes what should take 15 seconds takes 30 seconds? Anyhow, I think you should do like Zapier and allow for 60...
  3. Pabblynaut

    Is it possible to format text when exporting from Pabbly to Google Docs?

    How can I format this text inside Pabbly: so it looks like the last line in this picture:
  4. Pabblynaut

    Is it possible to format text when exporting from Pabbly to Google Docs?

    I send the below text to Google docs. Is it possible to format it like below? How do you bold, change text size, cursive text inside the same message from Pabbly to Google Docs? Instructions to Ask a Question Click on the "Ask a Question" button and select the application for which you would...
  5. Pabblynaut

    OpenAI - Response not received in 25 seconds.

    For OpenAI, the settings don't make sense. In Pabbly, it says that "Enter the maximum number of tokens to generate the content. Max limit is up to 2048 tokens. Default value is 256." But everything I have tried over 900 tokens consistently fails. Not every time, but like every other time. Is...
  6. Pabblynaut

    Is it possible to split an array?

    I have 100 lines in an array. Is it possible to split those into 10 and 10 lines?
  7. Pabblynaut

    Automatically retry step before moving on?

    Thanks, but I do not want to do that. I want the workflow to automatically retry a step in a the flow if that step times out.
  8. Pabblynaut

    Automatically retry step before moving on?

    Nobody else needs to do something like this?
  9. Pabblynaut

    Automatically retry step before moving on?

    I have a process with 20+ steps. Sometimes step 7 times out, sometimes step 13 times out, sometimes none time out. Is it possible to auto-retry a failed step before the process moves on to the next step?
  10. Pabblynaut

    How to get iterator output into 1 cell instead of 3

    Hi! I have made my first try using the Iterator. I get 3 rows of data into the iterator, and then use add new row in Google Sheets. But this outputs 3 rows, but I need the data from the iterator into 1 cell, not 3. How do you get all data from the Iterator into 1 cell?
  11. Pabblynaut

    How to make a numbered list un-numbered?

    That code gave only this as a result for the list in the original post: 1.
  12. Pabblynaut

    How do you split by line number?

    How can I split text every 5 lines? In other words turn this: Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aliquam tincidunt mauris eu risus. Vestibulum auctor dapibus neque. Nunc dignissim risus id metus. Cras ornare tristique elit. Vivamus vestibulum ntulla nec ante. Praesent...
  13. Pabblynaut

    How to make a numbered list un-numbered?

    I don't know anything about Regex, but I managed to make this work inside Google Sheets by using this formula: =REGEXREPLACE(REGEXREPLACE(REGEXREPLACE(REGEXREPLACE(REGEXREPLACE(REGEXREPLACE(REGEXREPLACE(REGEXREPLACE(REGEXREPLACE(REGEXREPLACE(F3,"9. ",""),"8. ",""),"7. ",""),"6. ",""),"5...
  14. Pabblynaut

    How to make a numbered list un-numbered?

    Any solution that works is fine with me, but what kind of regex and where do I put it, I wonder :-)
  15. Pabblynaut

    How to make a numbered list un-numbered?

    I get some external data into Pabbly that looks similar to this: Bob Karen Rob Hans Robert Hans Elsa Peter Bjorn Nina How can I get Pabbly to instead format it like this: Bob Karen Rob Hans Robert Hans Elsa Peter Bjorn Nina Also, the number of lines varies, so one input could have 7 rows, and...
  16. Pabblynaut

    Is batch delay possible?

    I think I figured this out, at least for my use case: 1) "Add Number Formatter by Pabbly" 2) Choose "Counter" 3) Initial value 0, Increment, Change value by 1, Reset on execution No, reset counter 5. 4) Add delay by Pabbly 5) In "Delay value", input the output from number formatter. This seemed...
  17. Pabblynaut

    Is batch delay possible?

    I have a Google Sheet where most days 30-40 rows are automatically added, but some days 200 rows are added. Each time a new row is added, triggers a workflow. My problem is on the day with 200 rows added at once, this gives error in the workflow, because there is rate limit in other tools...
  18. Pabblynaut

    How to remove range of numbers

    I have data coming into Pabbly that looks like this: Sky full of stars 288 USD Brand new Harlequin Kiss 12 USD Good The Planet Of The Plant People 1999 USD Acceptable Which tool in Pabbly can I use to remove 1..2000 USD from all titles? Any help is appreciated!
  19. Pabblynaut

    Extract all urls from emails

    I have set up an email parser that some mails are forwared to regularly. Some emails contain 2 urls, some contain 3,4,5,6 or 7, and the urls are placed on different places in the emails each time. Is there a way to "Extract all urls" from each email automatically?
Top